- Shamsher Khan Tomb at Shamsher Nagar :- Conservation of enclosure wall of Shamsher Khan Tomb is being done with Lakhauri bricks on lime surkhi mortar.
- Sher Shah Suri’s Tomb at Sasaram :- In addition to day to day maintenance of the monument landscaping work and dismantling of out let channel is being done.
- Man Mahal at Varanasi :- Laying of Kankar-lime on the top of the roof to Check the seepage of water, pointing on ashlar stone masonry on exterior side of the monument and resetting of chajja of courtyard is being carried out.
- Stupa at Lauriya Nandangarh :-Towards eastern side by taking out old, damaged and deteriorated ancient bricks and resetting them in lime surkhi mortar by using special size bricks has been done. Construction of boundary wall in remaining portion has been completed to prevent the encroachments and trespassing of local residents.
- Tomb of Makhdum Shah Daulat, Maner :- Repair of eastern side Kiosk in tank by construction of a coffer dam and lakhauri bricks in face with random rubble masonry filling is being done.
- Stupa near Banganga at Rajgir : - Construction of boundary wall is in progress.
- Rock cut caves at Barabar - To maintain the proper slope and check the stagnation of water, landscaping has been done around the caves by cutting of unwanted earth.
- Excavated remains at Sujatagarh, Bakraur - To provide civic amenities to the visitors construction of toilet block is being carried out.
- Archaeological Museum Bodhgaya - To provide civic amenities to the visitors construction of toilet block is being carried out.
- Buddhist Stupa at Kesariya :- As a measure of providing civic amenities to the visitors construction of Toilet block has been completed. Conservation of structures exposed during excavations towards eastern and western side of the stupa is being carried out. The work is under pipeline. RCC panels are also under preparation for construction of boundary wall on Buddhist pattern keeping in mind the characteristic of the site.
- Ruined fortress of Chankigarh - For round the clock watch and ward duty one unit staff quarter has been provided at the site itself. Construction of said work is completed for the accommodation of the Group ‘D’ Staff. The ramp portion uncovered by way of scientific clearance work is being conserved by using special size bricks is in progress.
- Raja Bali ka Garh at Balirajgarh - Construction of the museum building to exhibit the excavated antiquities from the site is in progress. About 80% of the said work has been completed.
- Raja Vishal Ka Garh at Vaishali :- To check the problems of encroachment and trespassing measures have been adopted for providing a boundary of dwarf wall with grill fencing. The work is in progress. Structural conservation of ancient structures are being carryied out by using appropriate ingredients.
|
|
|